Menu Side

Business and Art Center 'Stary Browar' in Poznań

Project: Business and Art Center "Stary Browar" in Poznań
Investor: Fortis Sp. z o.o.
General Contractor: EC Harris Sp. z o.o.
Time of construction:
2003
Area: 64 628 m2
Cost of works: 12 000 000 PLN

Business and Art Center "Old Brewery" join business, shopping and cultural functions. The building was built based on over 100-years old Hugger Brothers' Brewery.
Elektromontaż executed installations in following buildings: Main Building, building on Półwiejska Street, Courtyard of Art, Tower, Villa. In all these buildings were installed: 4000 lighting fixtures, 150 000 m cables, 12 000 m cable routes and 60 switchgears and control panels. 

Scope of works executed by Elektromontaż Rzeszów: 

  • preparation of technical design and "as-built documentation
  • coordination with other trades
  • SN cables for power supply
  • installation of transformers
  • supply, installation and connection of LV distribution boards
  • power supply installation
  • external and internal lighting
  • lightning installation and equipotential bonding
  • supply and installation of generator
  • weak current installations
  • fire detection and alarm system
  • access control system 
  • telephone and structural cabling
  • industrial television
  • sound amplification installation
  • tests and start-up of installation